Payten’s Bridge, Lachlan River, 1926

FAST FACTS

Constructed: 1926

Current Status: Operational

Strategy: Replace

ENGINEERING DETAILS

The Allan Truss

Truss Type:
90’ Allan

Geometry: 2 truss spans, 8 approach spans, total length approximately 130 m.